亚洲精品不卡久久久久久姆,丁香婷婷六月综合缴清,欧美日韩亚洲高清在线观看,在线观看伦理片一级视频网站,视频区图片区小说区第一页,一区二区三区精品视频在线免费观看,国产无遮挡刺激又黄又爽的网站,本土自拍高清熟女,亚洲av一片,午夜精品 国产

            hot

            Recommended News

            Home >Recommended News

            Current location:Recommended News

            Taught you how to - wall rock wool insulation

            2016-03-22 17:11:44

            Wipe the surface polymer anti-crack mortar buried fiber form thin plastering layer, thickness of surface normal 3-5 mm, enhanced 5-7 mm, exterior trim surface for coating.

            Construction conditions:

            1, exterior insulation construction should be outside the structure, the door window frame, door window all kinds of wall installation after the completion of the construction acceptance of embedded parts, etc. (this project have outdoor fire stairs and steel structure canopy, all need to do embedded parts)

            2, the operating environment temperature recently just belong to the dry weather does not affect the construction (rainy days construction cause rock wool water absorption and deformation, the wind is not greater than (rock wool prone to human respiratory inhalation of silk floss after crushing). In view of the construction conditions are ripe, this project construction more smoothly.

            Material preparation:

            10 mm thick outer wall of the lateral stick flame retardant molding WTO rock wool board (bulk density of 150 kg/m3, adhesive adopts outer wall heat preservation dope, alkali resistance plastic coated glass fiber grid cloth, enhanced grid cloth hole center distance 6 x6 ㎜ grid cloth. Regular grid cloth hole center distance ㎜. 4 * 4 layer USES the crack polymerization mucilage.

            The main equipment and tools preparation:

            (1) decorated with hanging basket: 20 sets of specifications 3 x 0.8 meters.

            (2) the hand tools, impact drill, rubber hammer, iron float, scraper, screwdriver and Man knife, etc.

            Second, the technological process and sequence of construction

            1, the technological process:

             

            1. The JPG

             

             

             

            2, the construction sequence: clean dressing base rock wool board exterior wall insulation after WTO that accords with a requirement from bottom to top paste, thin plaster from the top down construction sequence of construction.

            Three, the key points of construction

            1, the primary wall treatment

            1) first clear the metope: at the grass-roots level surface should be clean, no oil, wax, release agent, coating, of weathering, dirt, frost, dirt or other obstruction of bonded materials.

            2) eye hole wall, brick joints shall be filled, at the grass-roots level shall be solid level off, the surface roughness is not more than 5 mm. Local protuberance, empty drum, loose and have get in the way of binding should eliminate pollutants, in order to make sure the wall surface is flat and level.

            3) the WTO rock wool board before construction should be washed metope, then use the polymer mortar leveling, mix proportion of polymer mortar is: ordinary Portland cement, fine sand, glue: water = 1:3:0. 3: right amount (weight ratio). Leveling surface at the top of the wall to place before post loaves of bread, cake and pull on line messenger wire again to 0.3 m to fasten on every vertical hanging straight after, to find in this line for leveling of basis at ordinary times, should guarantee before wall plastering moist, each frame on foot after inspection qualified, on to the next step of plaster, plaster, should always check whether there is any shift on all of the line of control, to ensure the verticality of the wall, flatness, ensure insulation board and wall body felt strong.

            4) good leveling layer are strictly forbidden to empty drum, and promptly from the top down water conservation, after the metope of the water must be dry before being insulation board construction.

            2, metope measurement and elastic line, hanging line

            1) in the Angle of Yin and Yang Angle and fixed window steel wire to determine vertical base level error, tags and recorded; In each layer under the windowsill principal tensile long horizontal line for measuring flatness error of metope, make records.

            2) according to the baseline plays the horizontal and vertical expansion joints grid lines.

            3) hang line. Metope full height fixed vertical wire, each layer board level.

            3, determine the position of the bottom insulation board

            According to have to play a good line of the location of the installation Angle brackets, spacing is 1200 mm, the unequal Angle L80 * 50 * 5, 150 mm in length, the distance of 1200 mm.

            4, adhesive dispensing

            1) formulation and production technology should be in strict accordance with the suppliers in the field.

            2) it's a two-component, dispensing adhesive plaster or mucilage with resin emulsion after opening, should be in before adding powder, with a special electric mixer will be fully stir evenly, then add a percentage of the uniform powder continue to stir until fully, to achieve consistency needed for the project.

            Or 3) one-component: adhesive plaster mortar powder material directly adding suitable amount of water, with a special electric mixer, mix to achieve consistency needed for the project.

            4) configuration may not be too much at a time, depending on the different environmental temperature control in 2 h or according to the product manual within the stipulated time run out.

            5) grid cloth should be performed at the end of heat preservation system the following double package: doors and Windows on both sides of the mouth of the cave, balcony, deformation joints, WTO rock wool board installed on the metope of the up and down or so the vertices to the card package grid cloth, fabric width 260 ㎜, length according to site specific conditions.

            5, paste the WTO rock wool board

            1) paste before rock wool board, should be in accordance with the requirements of building facade design and external thermal insulation technology, pop-up in metope outside door, window, horizontal and vertical line and adjustable suture, decorative lines, decorative thread, etc. Should be in the Angle of building external wall of Yin and Yang and other necessary hanging vertical baseline, each floor place hang is horizontal, to control the verticality and roughness of the rock wool board; And the system starts and terminal first went package or bag edge processing.

            2) on the outside walls of the smooth processing with a chalk line along the 20 mm from aproll elevation position pop-up is horizontal, when need to set up the system deformation seam, should be in the pop-up deformation cracks of wall and the width of the line, rock wool board bond position, and rock wool board shall consider the hole wall distribution board, base on line. System at the bottom of the first row of the side panel under the end of the rock wool board with aproll spacing not less than 200 mm, and USES the EPS, XPS and hard foam polyurethane heat preservation processing, le foot parts should be installed Angle brackets.

            3) rock wool board should be bottom-up, horizontally laid paste, vertical seam should be 1/2 plate long break line by line, in the corner should be staggered interlock, vertical seam should be done line by line, keep the perpendicularity of the corner. The WTO after the rock wool board bonded, leave one day, before the next working procedure, and shall ensure that the perpendicularity of the corner.

             

            2. JPG

             
            logo

            We are a team spirit, occupy the industry with technology, win the market with quality, and serve attentively is our purpose. We work with the times to jointly develop new composite products and provide better services for customers. We warmly welcome new and old customers to visit and guide us!

            Heat preservation and heat insulation cotton

            High temperature resistant fireproof fabric

            All copyright © 2008 shenzhen Petersburg composite materials co., LTD. All Rights Reserved

            網(wǎng)站ICP備案號:粵ICP備17025923號

            Support:Website | zk71  | Manage

            二維碼

            二維碼

            phone

            All copyright © 2008 shenzhen Petersburg composite materials co., LTD. All Rights Reserved

            久久网站免费观看| 亚洲一区二区三区AV天堂| 国产一区自拍网站| 亚洲最新av网址| 激情偷乱人伦小说免费看| 无码中文字幕乱在线观看| 精品熟女少妇av| 18欧美亚洲国产网站| 国产成人精品亚洲区| 日韩精品成人高清在线观看| 日韩精品久久久久久久电影99爱| 国产精品无码久久久久久久久| 高清无码免费观看一级中文字幕| gogo全球美女高清大胆啪啪啪| 国产真实乱偷精品视频免| 成人精品一区二区三区在线观看| 日本高清另类videohd观看方式| 无码不卡中文字幕av| 91原创影院| 国产精品福利影院在线| 国产激情一级毛片久久久| 久久综合婷婷丁香五月中文字幕| 亚洲第一综合色| 五月婷婷激情在线| 999国产精品999久久久久久| 亚洲大片免费在线观看| 国产精品久久久久久福利app| 一级毛片aaaaaa免费看国语| 国产成人一区二区三区综合区精品| 一区在线观看免费| 欧美乱妇狂野欧美在线电影| 欧美浓毛老妇| av 毛片免费看| 亚洲精品国产综合99久久小说| 久久99精品久久久久久齐齐| 白浆流出在线| 亚洲婷婷丁香| 最近中文字幕mv在线高清| 91精品久久午夜中文字幕| 成人精品人人爽视频| 国产色产综合产在线视频|